Skip to main navigation.
Outage Reporting: (406) 467-2527 or 800-452-7516

General Service GS-1 Small Commercial

Effective January 1, 2017

Type of Service

Three phase, 60 cycle at cooperative's available secondary voltage; or single phase, when three phase is not readily available and less than 50 KVA of installed transformer capacity is required, subject to the rules and regulations of the cooperative.

Availability

To all members requiring three phase service or single phase non-residential service of less than 50 KVA of installed transformer capacity.  Motors in excess of 10 HP must be three phase, unless approved by the cooperative.

At the cooperative’s discretion, a member with non-typical patterns of usage may be more appropriately placed on the GS-2 tariff.

Monthly Rate

Base Rate

 $38.00

Demand Charge

Energy (Distribution) Charge

$1/kw  

$.04000/kwh

Purchased Power Rider

Members in this rate class are also subject to the Purchased Power Rider.  For more information, see Schedule PPR (Purchased Power Rider).

Minimum Monthly Charge

The minimum monthly charge shall be the higher of the following:

  1. The cost for service as calculated by the rates specified.
  2. $1.00 per KVA installed transformer capacity over 20 KVA, plus the base charge.

Power Factor Adjustment

The consumer agrees to maintain unity power factor as nearly as practicable.  At the option of the cooperative the power factor and KW demand of the consumer shall be measured and the monthly bills adjusted.  Such adjustment shall be made by increasing the bills by 1% of each 1% by which the average power factor is less than 95% lagging.  At the request of the cooperative the consumer agrees to apply corrective measures to his load to bring the average power factor to 95% lagging, or higher.

Powered by Touchstone Energy Cooperatives Logo